News

October 28, 2011 OJSC "Turboatom" shipped high-pressure cylinder and rotor of high-pressure for turbine unit No 8 of Kurakhovskaya TPP.

OJSC "Turboatom" has completed the third quarter of 2011 with a net profit in the amount of 310.6 mln. hryvnas

At OJSC "Turboatom" finalized the project planning of updating the turbine K-500-240-2 with capacity 500 MW for unit No 2 Ekibastuz TPP-1.

As part of the reconstruction of foundry of OJSC "Turboatom" will be updated blacksmith workshop section castings and forgings (No 50).

October 22, 2011 OJSC "Turboatom" was visited by government delegation of the Republic of Tajikistan in the Ambassador Extraordinary and Plenipotentiary of the Republic of Tajikistan in Ukraine Shukhrat Sultonov and Minister of Education of Tajikistan Abdujabbor Rakhmanov.

October 20, 2011 OJSC "Turboatom" was visited by the delegation of the Ministry of Foreign Affairs of Ukraine, which included 22 diplomats headed by the Director of the Department of Foreign Economic Cooperation Ministry of Foreign Affairs Igor Nikolayko.

October 13, 2011 OJSC "Turboatom" shipped blades of wicket gate for Kremenchug HPP (plant number 3).

October 13, 2011 OJSC "Turboatom" signed a contract to supply equipment for the unit No 5 of Novovoronezh NPP.

13.10.2011 11:50  Attention to journalists!

Ladies and gentlemen! October 14, 2011 from 10:30 OJSC "Turboatom" holds a press tour.

October 12, 2011 in the framework of Ukrainian-Slovenian Business Forum General Director of OJSC "Turboatom" signed protocols on cooperation with Slovenian companies "LITOSTROJ STEEL Ltd." and "RIKO d.o.o."


Archive

…prev   1   2   3   4   5   6   7   8   9   10   11   12   13   ...   36   37   38   next…