News

August 16-19, OJSC "Turboatom" participates in the annual common government exhibition share "Barvysta Ukraina" on the occasion of the 20th anniversary of Independence of Ukraine, which takes place in National complex "Expocentre of Ukraine" in Kyiv.

Was shipped the first body of the condenser for Rostov NPP (Russia)

In July 2011, OJSC "Turboatom" entered into a contract for the modernization of the block No 2 Tripolskaya TPP (Ukraine) with the replacement of the turbine K-300-240 on a new generation of turbine K-325-23, 5 on the sum of 180 mln. hryvnas.

OJSC "Turboatom" manufactured and dispatched under the shipping steam-admission collector and diaphragms to block No 3 of Rostov NPP.

August 1-5 the delegation of "Turboatom" headed by General Director Viktor Subbotin visited with a working visit Kazakhstan.

August 2, 2011 "Turboatom" shipped to NPP Balakovo control system of turbine unit.

August 3, 2011 specialist of "Turboatom" went to Gotsatlinskaya HPP for implementing of supervision of erection of hydro-mechanical equipment of units No 1 and No 2, that delivered earlier.

July 29, 2011 OJSC "Turboatom" shipped regulating ring and cover for the turbine unit number 22 of the Kama HPP (Russia)

As part of the program of modernization of the blade production in July 2011 by JSC "Turboatom" complete overhaul Sanders produced by Swiss firm "Metabo".

July 25, 2011 OJSC "Turboatom" and Slovenian engineering company Rico contracted to supply equipment for the reconstruction of the foundry (№ 50)


Archive

…prev   1   2   3   ...   7   8   9   10   11   12   13   14   15   16   17   ...   36   37   38   next…